E0', preparation and test beam in 2004


Photos at H4
SC03 assembly photos
SC04 assembly photos

E0 prime drawings

2005
VFE cards used in H4 in 2004 for SC03/4  htm

2004 Test beam programme details
E0' + SC03 + SC04 channel/xtal numbering ppt
SC04 channel/xtal/apd data/numbering ppt xls
SC03 channel/xtal/vpt data/numbering  ppt  pdf  xls
E0prime geometry on turntable ppt
E0prime SC geometry ppt
E0prime geometry ppt
Chinese crystals, distribution of induced absorption, cantonal data pdf
Chinese crystals, cantonal irradiation data xls
Angles of SCs and backplate to beam ppt
E0' backplate drawing  pdf  ps
E0' geometry, note from B Kennedy 16.1.2003 txt

2004
First H4 periods in 2004 for E0prime txt

Update and running, Test beam Meeting, D Cockerill  26.5  ppt
Planning status  24.5  xls
Test beam meeting - update on programme and planning  27.4  ppt
New testbeam planning  27.4   xls
Update on electronics, M Dejardin  27.4  ppt
Test beam meeting slides/discussion 14.4  ppt 
Test beam planning, D Cockerill 14.4  xls
E0' tests, D Cockerill 6.4 ppt xls 
E0' mounting details for TA1 group, D Cockerill 6.4 ppt
E0' test beam angles, D Cockerill 6.4 ppt
E0' on turntable + turntable support structure, L Linssen  24.5  doc  hpgl

2003
Notes on electrical setup with SC02, D Cockerill  19.8   ppt
As of 28.7.03, equipped with SC02, umbilical: filitex mini-cable with overall scrn
into a Dee type connector and straight into Stephenson Preamp box, no terminator card.
Comments on CAMAC to PC readout, Windows 2000 vs 98, D Cockerill 13.6  doc

2002
Discussion document for E0' tests in 2003, B Ille, M Hansen, O Teller, D Cockerill  6.12  doc
E0' beam tests in 2003, update to TCG 19.11 & Paris WACH4, D Cockerill  28.11  ppt

2001
ECAL Annual Review, E0prime photo 19.9  ppt